|
Awarded contracts 2011 1. Downstream Conveyance System – Contract 1 Contractor: UNIK Construction Contact: Mr. X.J. Yang Phone: +266 6266 8313 Email:
This e-mail address is being protected from spambots. You need JavaScript enabled to view it
2. Downstream Conveyance System – Contract 2 Contractor: WBHO Construction Contact: Mr. Thabiso Makepe Phone: +266 6304 3330 Email:
This e-mail address is being protected from spambots. You need JavaScript enabled to view it
3. Metolong Dam and Pump Station Construction Contractor: Sinohydro Corporation Limited Contact: Mr. Xiao Rui Phone: +266 6349 9855 Email:
This e-mail address is being protected from spambots. You need JavaScript enabled to view it
4. Water Treatment Works Contractor: CMC/Botjheng Joint Venture Telephone: +266 5252 0262 Contact: or Martin Els +27 836 321 608 5. Advance Infrastructure Phase 2 – Electrical Supply Contractor: Lesotho Steel Products Contact: John Goddard +266 5946 3880 6. Advance Infrastructure Phase 2 – South Access Road Contractor: Rumdel Construction Holdings Contact: Pienaar van Zyl +266 6809 7968 7. Civil Works (roads, storm water drainage, water distribution, pedestrian bridge and associated works for the camp site) Contractor: Unik Construction Contact: Ms Judy NI +266 2233 4075 / +266 5866 8313
|