PDF Print E-mail

Awarded contracts 2011

1.       Metolong Dam Construction

Contractor:         Sinohydro Corporation Limited

Contact:             Mr. Song Yijun

                         Phone:  +266 5713 8187

                         Email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it

 

2.       Water Treatment Works

Contractor:         CMC/Botjheng Joint Venture 

Telephone:         +266 2232 1184

Contact:             or Martin Els +27 836 321 608

Location:            LNDC BLOCK D, 9th FLOOR

 

3.       Advance Infrastructure Phase 2 – Electrical Supply

Contractor:         Lesotho Steel Products

Contact:             John Goddard +266 5946 3880

 

4.       Advance Infrastructure Phase 2 – South Access Road

Contractor:         Rumdel Construction Holdings

Contact:             Pienaar van Zyl +266 6809 7968

 

5.       Civil Works (roads, storm water drainage, water distribution, pedestrian bridge and associated works for the camp site)

Contractor:         Unik Construction

Contact:             Ms Judy    NI +266 2233 4075 / +266 5866 8313